PROJECT STUDY / POWER + COOLING

Factory power + chilled water

Factory utilities during grid delay

Factory power + chilled water

Customer study / application concept. Completion status, installed capacity and measured results have not been published in the supplied company profile.

THE REQUIREMENT

Understanding
the challenge.

A factory may need both electricity and chilled water while awaiting its permanent utility connection. Separate temporary systems can complicate operation and energy planning.

PROPOSED APPROACH

A site-specific configuration

An integrated gas-to-power and cooling concept, assessing recovered heat for absorption chilling and optional storage.


Design priorities

Electrical demand, cooling temperatures, operating hours, heat balance and plant space.

Developing the next step.

A detailed assessment establishes the equipment configuration, operating responsibilities and commercial terms. Project-specific costs, savings and performance commitments require an agreed technical and financial model.