PROJECT STUDY / DISTRIBUTED ENERGY

Outdoor media energy

Municipal diesel phase-out for permanent hoardings

Outdoor media energy

Customer study / application concept. Completion status, installed capacity and measured results have not been published in the supplied company profile.

THE REQUIREMENT

Understanding
the challenge.

Distributed billboards require a repeatable power model that accounts for site access, operating schedules and the logistics of supplying multiple locations.

PROPOSED APPROACH

A site-specific configuration

Solar + BESS, stationary storage or swappable batteries with a central charging hub, route planning and remote monitoring.


Design priorities

Per-site load, solar exposure, access frequency, battery logistics and metering.

Developing the next step.

A detailed assessment establishes the equipment configuration, operating responsibilities and commercial terms. Project-specific costs, savings and performance commitments require an agreed technical and financial model.

Discuss a similar requirement
YOUR NEXT PROJECT

Let’s build your
energy solution.

Discuss your requirements